The maps, charts, and tables provide tools for exploring the data in detail.
Permitting and interconnection requirements that may impact these timelines or install costs are shown at the bottom, along with median project timelines for the state(s) in which the AHJ(s) are located
Name | SolSmart Awardee | SolSmart Three-Day Permit Target | Online Permitting | Instant Online Permitting | Same Day In Person Permitting Available | Electrical Review | Structural Review Required | 3rd Party Permit Review | Online Permitting in 2019 |
---|
Name | State | Approval to Build required from utility before install | Direct Point of Contact for Interconnection Information Available | Application Acceptance Method | Online Payment Accepted | IX Application Response Time Requirement | Response Time Requirement (Business days) | Offset Policy in Place from Utility | Offset Percentage | Capacity Map |
---|
Name | AHJ Permit Time | Pre-Install Interconnection Time | Install Time | Inspection Time | Post-Install Interconnection Time | Total PII Cycle Time |
---|